Maintenance

End-to-end maintenance management and predictive maintenance

Plan servicing for machines, moulds and devices, assign crews and track every job through to acceptance. Spare parts, permits, external repairs and costs stay with the asset record.

Open work orders, priorities and spare parts below minimum stock.

Capabilities

Planned maintenance and breakdowns in one history

Record breakdown repairs and planned servicing against the same machine, with the time spent and costs incurred.

Preventive plans

Schedule service by calendar, runtime, shots or pieces. Out-of-range condition readings can trigger work orders.

Checklist work orders

Assign crews, record working and waiting time, escalate missed deadlines and require independent acceptance where needed.

Breakdowns from the floor

Report a fault by scanning the machine QR code or record corrective work at the kiosk or on a phone.

Spare parts with QR labels

Reserve parts for planned jobs, scan what is used, and raise a purchase request when stock falls below its minimum.

External repairs

Approve dispatch, record the condition on departure and inspect the asset on return. Keep the repair cost with the asset.

Planned against actual

See technician capacity, planned shutdowns and budgets, service contracts, maintenance costs and whether an asset is worth repairing.

Know the condition and cost of each asset

Keep components, drawings, warranties and previous work on one record. Monitor breakdown causes, mean time between failures, repair time and preventive maintenance compliance. Trend warnings can create follow-up tasks.

Asset structure and component records.
Maintenance indicators by period and machine group.

Control how maintenance starts and ends

Configure permits to work, personal lockout and tagout, technician qualification checks and independent sign-off. Work orders can include measurements, required photos and follow-up actions. Field history records what changed, who changed it and why.

Permits linked to equipment and work orders.

From external repair to approved restart

Track shipments by supplier, due date and cost. Use dispatch and return checklists, then accept or reject the repair. A configured release process can require restart approval for a machine or a first-article check when a repaired mould is mounted again.

External repairs by supplier, status and expected return.
Checklist and inspection actions on a returned mould.